Glossary

Plain-language definitions of every term in the app.

A quick reference for the words you will see throughout KManagement. Terms are grouped by topic; within each group they build on one another.

People & structure

Workspace (company)
Your organization’s private space in the app. All your data lives here.
Team
A group of people. Each team member is marked as the team’s manager or a member.
Title
A job position such as Junior, Middle, or Senior. Titles can carry preset targets and bonus amounts, and can be used to assign a framework to everyone with that title.

Designing the scoring

Framework
The tree that defines how a person is scored: the things you measure and how much each one counts. This is the central thing managers build.
Node
Any item in a framework tree — either a group or a metric.
Group
A node that holds other nodes and combines their scores into one. Groups let you build sections like “Productivity”, “Quality”, and “Behavior”.
Metric
The actual thing being measured at the bottom of the tree, such as story points delivered or number of bugs.
Metric type
The rule that turns a raw number into a score. Examples: target-vs-actual, ratio, percentage, yes/no, a count, or a formula. See Frameworks.
Weight
How much a node counts compared to its siblings. Weights are balanced automatically, so they do not need to add up to 100.
Achievement %
A node’s score as a percentage. It can go above 100% for over-performance.
Final KPI %
The single headline percentage for a person in a cycle — the top of the tree.

Grades & bonuses

Grade scale
The set of letter grades (for example D, C, B, A, A+, A++) and the percentage range each one covers.
Grade
The letter a final KPI % maps to.
Demotion rule
A rule that can lower a grade when a specific area is too weak — for example, forcing a low grade if discipline falls below a threshold. Rules only ever lower a grade.
Coefficient
A multiplier tied to each grade, used to work out a bonus.
Bonus target / bonus amount
A confidential target amount set per person; the actual bonus is the target multiplied by the coefficient, frozen at the moment results are calculated.

Running a period

Assignment
The link that attaches a framework to a team, a title, or an individual.
Cycle
One evaluation period (usually a month). A cycle moves through the states draft → active → locked → closed.
Measurement
A person’s raw numbers for one metric in one cycle. The source can be manual, Jira, a violation record, or a team roll-up.
Missing-value policy
What happens when a metric has no value: skip it, score it 0, score it 100, or block the calculation until it is filled in.
Result
The calculated score for each node, plus the final KPI %, grade, and bonus.
Snapshot / version
A frozen copy of the framework saved when it is published or when a cycle starts, so past results never change if the framework is later edited.
Provenance
Where a number came from (manual entry, Jira, a violation, a team roll-up) and whether it was overridden by hand.

Collaboration

Approval
The sign-off step where results are requested, acknowledged or disputed, and finally approved before a cycle closes.
Comment / mention
A note attached to a result or a single metric. Mentioning a teammate with @ notifies them.
Violation
A recorded discipline event that can feed into a metric.
Notification
An in-app or email alert about something that needs your attention.