Glossary
Plain-language definitions of every term in the app.
A quick reference for the words you will see throughout KManagement. Terms are grouped by topic; within each group they build on one another.
People & structure
- Workspace (company)
- Your organization’s private space in the app. All your data lives here.
- Team
- A group of people. Each team member is marked as the team’s manager or a member.
- Title
- A job position such as Junior, Middle, or Senior. Titles can carry preset targets and bonus amounts, and can be used to assign a framework to everyone with that title.
Designing the scoring
- Framework
- The tree that defines how a person is scored: the things you measure and how much each one counts. This is the central thing managers build.
- Node
- Any item in a framework tree — either a group or a metric.
- Group
- A node that holds other nodes and combines their scores into one. Groups let you build sections like “Productivity”, “Quality”, and “Behavior”.
- Metric
- The actual thing being measured at the bottom of the tree, such as story points delivered or number of bugs.
- Metric type
- The rule that turns a raw number into a score. Examples: target-vs-actual, ratio, percentage, yes/no, a count, or a formula. See Frameworks.
- Weight
- How much a node counts compared to its siblings. Weights are balanced automatically, so they do not need to add up to 100.
- Achievement %
- A node’s score as a percentage. It can go above 100% for over-performance.
- Final KPI %
- The single headline percentage for a person in a cycle — the top of the tree.
Grades & bonuses
- Grade scale
- The set of letter grades (for example D, C, B, A, A+, A++) and the percentage range each one covers.
- Grade
- The letter a final KPI % maps to.
- Demotion rule
- A rule that can lower a grade when a specific area is too weak — for example, forcing a low grade if discipline falls below a threshold. Rules only ever lower a grade.
- Coefficient
- A multiplier tied to each grade, used to work out a bonus.
- Bonus target / bonus amount
- A confidential target amount set per person; the actual bonus is the target multiplied by the coefficient, frozen at the moment results are calculated.
Running a period
- Assignment
- The link that attaches a framework to a team, a title, or an individual.
- Cycle
- One evaluation period (usually a month). A cycle moves through the states draft → active → locked → closed.
- Measurement
- A person’s raw numbers for one metric in one cycle. The source can be manual, Jira, a violation record, or a team roll-up.
- Missing-value policy
- What happens when a metric has no value: skip it, score it 0, score it 100, or block the calculation until it is filled in.
- Result
- The calculated score for each node, plus the final KPI %, grade, and bonus.
- Snapshot / version
- A frozen copy of the framework saved when it is published or when a cycle starts, so past results never change if the framework is later edited.
- Provenance
- Where a number came from (manual entry, Jira, a violation, a team roll-up) and whether it was overridden by hand.
Collaboration
- Approval
- The sign-off step where results are requested, acknowledged or disputed, and finally approved before a cycle closes.
- Comment / mention
- A note attached to a result or a single metric. Mentioning a teammate with @ notifies them.
- Violation
- A recorded discipline event that can feed into a metric.
- Notification
- An in-app or email alert about something that needs your attention.